How long does it take to make an architectural scale model?

Turnaround depends on scale and complexity. At RD Models a compact society model can be ready in 5–7 days, while a large township or masterplan model typically takes 3–5 weeks. Urgent projects, including overnight builds for launches and site visits, are handled through the studio's multi-city workshop network.

By Ar. Rohitash Daiya · Updated

What sets the timeline

  • Design readiness: final drawings start production sooner than concepts that are still changing.
  • Scale and area: bigger models need more cutting, assembly and finishing time.
  • Detail and features: landscaping, interiors, lighting and moving parts add stages.
  • Approvals: a quick sign-off on the mock-up or colour palette avoids rework.
  • Logistics: crating, transport and installation time at the destination.

Planning backwards from your event

For a sales launch or tender presentation, fix the delivery date first, then add a buffer for installation and lighting commissioning. If the date is tight, tell the studio at the quote stage so the work can be split across workshops.

Frequently asked questions

Can a model be built overnight?
RD Models handles rush projects, including overnight builds for launches and site visits, using its multi-city workshop network. Feasibility depends on the model's scale and detail, so ask at the enquiry stage.
How long does a township model take?
A large township or masterplan model typically takes 3–5 weeks.

See examples in our Masterplan Models portfolio, or browse our workshops across India.